The ramblings of Steve-0Posts RSS Comments RSS

Blood, Sweat, and Sledgehammers

Call us crazy, but this weekend we started on our third bathroom remodel (for those keeping count, that’s the third of three bathrooms in the house). It’s always fun when you can grab a three-pound hammer and go to town on the walls, but it does draw both blood and sweat (I sliced up my hands even with gloves on). Now that we’re seasoned pro’s when it comes to this stuff ;), things move pretty quickly, and I’d say we spent 6 or 7 hours total on the demo, and basically stripped the bathroom to walls and floor only.

In the weeks to come, we’ll be installing new plumbing (fixtures, etc), new tub, drywall/backer board, tile, new pedestal sink, wainscotting, etc. We’ll post photos and notes along the way, here are some pics of this weekend’s adventures.

No responses yet

Leave a Reply

You must be logged in to post a comment.